Construction of the 40 km long four-lane expressway along the south of the Fraser River that connects the Tsawwassen Ferry Terminal in Delta to Highway 1 at 176th Street in Surrey.
$1.3 Billion
General Contractor
FTG Constructors Ltd.
Greenbelt was responsible for the sand preloads and earthwork on all the interchanges.